InfinityRL™ Solution
Ambyint’s InfinityRL rod lift optimization solution delivers leading edge optimization and diagnostics capabilities for rod lift wells. The solution is data-source agnostic, meaning it’s compatible with all robust SCADA systems to enable rapid deployment of large fields of rod lift wells. InfinityRL improves visibility into equipment operating conditions, reduces time spent surveilling and analyzing wells, and automates key well optimization workflows to enable improved workforce efficiency and scalability.
Ambyint’s InfinityRL technology utilizes a differentiated approach, combining physics-based models with SME insights and artificial intelligence to deliver value to customers. The autonomous, closed-loop control of key pump-off controller setpoints significantly reduces the need for manual surveillance and optimization workflows, while custom, automated reports ensure that operations staff receive concise summaries of critical information directly to their inboxes. Ultimately, InfinityRL’s rapid optimization system provides robust analytics and reporting capabilities, anomaly detection, and autonomous setpoint optimization for improving workforce efficiency and production.
Customer: Chord Energy
Chord Energy is an independent oil and gas company operating in the Bakken and Three Forks plays in North Dakota and Montana. With a commitment to energy, community engagement, and technological innovation, Chord Energy aims to drive positive change in the energy industry.
- Industry: Oil and Gas
- Basin: Bakken
- Number of Wells: 2,500
- Project Timeframe: 2022 to present
- Website: https://www.chordenergy.com/
Challenges
Chord Energy faced challenges in optimizing production efficiency across their oil wells. Previous solutions failed to deliver desired results, prompting the need for a comprehensive solution that could improve operational efficiency, reduce failure rates, and save on operational costs.
Deployment
Chord deployed Ambyint’s InfinityRL technology on 2,500 rod lift wells via a SCADA integration. This included approximately 2,400 VFD/POC wells to optimize min/max SPM, and ~100 POC wells to optimize idle time. No additional hardware was required for the Ambyint deployment; it was purely a software connection with Chord Energy’s existing systems.
This deployment aimed to:
- Provide improved analytics and reporting for both operations and engineering staff
- Reduce the number of man hours for various operations and engineering staff via our autonomous optimization capabilities and card-based anomaly detection
- Increase production and reliability