The team at EJB was out today using lime to dry out a basin so the dirt contractor can export the material.
Big Blue was out front doing the heavy lifting while our big-tired spreader laid down a clean, consistent application to get the moisture under control.
Proud of our crew for turning soft, saturated material into something workable and keeping the project moving.
#EJB #SiteWork #LimeDrying #Stabilization #ConstructionLife #Teamwork

