We’ve all had a bad day, even a bad week. They can be dealt with and soon forgotten. A project that goes bad, now that’s something else entirely. A big component of construction is dealing with the elements, rain, snow, high temps, etc. We all find ways to deal with what mother nature sends us.
What do you do when your building pad is undercover and resembles a swamp. Heavy clays and moisture with no wind or sun to help dry your soils. Utilizing Cement Stabilization, this 66,000sf building pad went from soup to solid, is on grade and ready for the concrete floor to be installed. The process took two days to complete. If your tired of wearing muck boots to work every day, contact John DeMartino .”