With the recent warm temperatures, it is important for your crews to keep hydrated when working outdoors. The same goes for E J Breneman’s Full Depth Reclamation process. With a target range of 1% to 3% over optimum soil moisture water is pumped from a water truck attached to the front of the reclaimer and injected into the mixing chamber.
Proper hydration will kick start the chemical reaction of the Portland cement as well as aiding in compaction. E J Breneman has a fleet of up-to-date water trucks ready to keep us moving, including the addition of a tractor trailer water tanker.
Just a reminder to keep your crews and processes hydrated this summer. For more information on the FDR soil stabilization process please contact John DeMartino or visit us at www.ejbreneman.com.
