MJ Painting’s Signature Garage Floor crews along with 8 members of their Natural Gas Field Services team worked together on this Natural Gas Compressor Station floor. In 1.5 weeks’ time, these crews applied over 400 gallons of primer and flooring top coat to these floors. Check out that shine!!!
Whether they’re doing an industrial floor like this one or a commercial floor or a garage floor, their team has the experience and the right equipment to get the job done and deliver beautiful results like this!
Give them a call (844-977-9700) or check them out on line at www.mjpaintingcontractor.com and www.signaturegaragefloorcoatings.com.