The Plato5X was launched in July to little fanfare. The unique problem- solving design has captured considerable interest and attention of data center developers as well as
Since the launch, various locations across the U.S. have expressed interest for these power needs:
- Edge Data Centers: 10 to 50 Megawatt size
- Medium-size centers: 100 Megawatt
- Industrial/Commercial plants, 5 Megawatt and up.
No More Power from the Grid
Many developers are being told that they can no longer pull power from grid. This problem has caused some developers to seek out the Plato5X self-sufficient utility platform.
Plato5X can get data center developers power in 2 years or less.
For additional information or partnership discussions, contact:
William Cristofaro PE, President Integrated Energy Concepts Engineering
Cell: 585 455 7330